The following pictures of Bandar Malaysia Utara MRT station taken during the construction.
Click to view from beginning.
Readiness of the Bandar Malaysia Utara MRT Station.


Photo Credits: mymrt.com.my.
View of the Bandar Malaysia Utara MRT Station entrance.

Final touch up works in progress at the Bandar Malaysia Utara MRT Station Back of House.

Photo Credits: mymrt.com.my.
Front elevation of the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Readiness of the Bandar Malaysia Utara MRT Station Entrance and Ventilation A buildings.

Readiness of the Smoke Extraction Fan Room at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Completion of louvres installation at the Bandar Malaysia Utara MRT Station Entrance B.

Photo Credits: mymrt.com.my.
External painting works for entrance buildings in progress at the Bandar Malaysia Utara MRT Station.

Readiness of the Back of House of the Bandar Malaysia Utara MRT Station concourse level.

Photo Credits: mymrt.com.my.
Construction of apron slab at Bandar Malaysia Utara MRT Station entrance parameter building.

Installation of louvres in progress at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
External works for Entrance and Ventilation A building in progress at the Bandar Malaysia Utara MRT Station.

Tunnel Ventilation Fan Room at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
External plastering works in progress at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the backfilling works at the Entrance A in progress.

External plastering works at the Entrance B in progress at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the external finishes for Entrance B building in progress.

Roadworks and external works in progress at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Electrical and mechanical works ongoing at the Bandar Malaysia Utara MRT Station Entrance A.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the preparation of base for roadworks in progress.

An inside view of the Bandar Malaysia Utara MRT Station showing readiness of the Front of House and completion of drywall partition at platform level.

Photo Credits: mymrt.com.my.
View of the Bandar Malaysia Utara MRT Station showing the earth backfilling on top of station box.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the earth backfilling prior road and drainage works.

View of the Bandar Malaysia Utara MRT Station showing the floor screeding works at the concourse level.

Photo Credits: mymrt.com.my.
View of the Bandar Malaysia Utara MRT Station showing the screeding works at back of house of the concourse level in progress.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the structural works in progress for Vent A and Entrance A.

View of the Bandar Malaysia Utara MRT Station showing the 33kv room energization in progress.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the Entrance A and B above ground structure rebar installation and casting works in progress.

View of the Bandar Malaysia Utara MRT Station showing the rebar works for Entrance B building in progress

Photo Credits: mymrt.com.my.
Aerial view of the construction progress with preparation for backfilling on top of the roof slab at the Bandar Malaysia Utara MRT Station.

View inside the Bandar Malaysia Utara MRT Station showing the completion of the Low Voltage Room 2.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the installation of rebar works for future roof slab in progress.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing construction progress of roof slab, column, internal wall, backfilling works and laying of water proofing.

Permanent walkway installation works in progress within the tunnel of the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the construction progress of roof slab, reinforced wall, column, backfilling works and laying the waterproofing.

Photo Credits: mymrt.com.my.
Installation of false works in progress for the roof slab at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Aerial view of the ongoing construction progress of roof slab, reinforced wall, columns, backfilling works, laying of water proofing and dismantling of strutting at the Bandar Malaysia Utara MRT Station

Laying track sleepers after the first stage concrete at the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
Rebar works fully installed for future mass concrete level at the Bandar Malaysia Utara MRT Station site.

Photo Credits: mymrt.com.my.
Aerial view of the ongoing construction progress of concourse slab, roof slab, reinforce wall, column, backfilling works and water proofing at the Bandar Malaysia Utara MRT Station site.

Installation of rebar works for future reinforced wall at the Bandar Malaysia Utara MRT Station site.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the ongoing roof slab, reinforced concrete wall, column and water proofing.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the ongoing reinforced concrete wall, column, platform slab and waterproofing works

Reinforced concrete wall and column casted until soffit level of the roof slab at the Bandar Malaysia Utara MRT Station site.

Photo Credits: mymrt.com.my.

Photo Credits: mymrt.com.my.
Aerial view of the Bandar Malaysia Utara MRT Station showing the construction of reinforced concrete wall, column and platform slab.

Underground station reinforcement concrete wall at basement level 1 has been completed and the same process is in progress at level 2 and 3 of the Bandar Malaysia Utara MRT Station.

Photo Credits: mymrt.com.my.
View of the Bandar Malaysia Utara MRT Station site showing construction of ongoing reinforced concrete wall, underplatform wall and column. Also seen is removal of ground anchor and strutting in progress.

Photo Credits: mymrt.com.my.
Aerial view of the ongoing construction of underplatform wall and platform slab at the Bandar Malaysia Utara MRT Station.

Construction of underplatform wall and platform slab in progress at the Bandar Malaysia Utara MRT Station site.

Photo Credits: mymrt.com.my.
Ongoing rebar works for concourse slab at the Bandar Malaysia Utara MRT Station box.

Photo Credits: mymrt.com.my.