The following pictures of Putrajaya Sentral MRT station taken during the construction. Click to view from beginning.
📅 December 2022
Overview of the station and external works completion at the Putrajaya Sentral MRT Station.
![Overview of the station and external works completion at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-december-01-large.webp)
Overview of the at grade park and ride for Putrajaya Sentral MRT Station.
![Overview of the at grade park and ride for Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-december-02-large.webp)
Enhancement works completed at the Entrance A, Putrajaya Sentral MRT Station.
![Enhancement works completed at the Entrance A, Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-december-03-large.webp)
Credits: mymrt.com.my.
📅 November 2022
Testing and commissioning of Automatic Fare Collection (AFC) gate system are in progress at the Putrajaya Sentral MRT Station.
![Testing and commissioning of Automatic Fare Collection (AFC) gate system are in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-november-01-large.webp)
Credits: mymrt.com.my.
📅 October 2022
Readiness for pre-Pemeriksaan Cermat Akhir in progress at the Putrajaya Sentral MRT Station.
![Readiness for pre-Pemeriksaan Cermat Akhir in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-october-01-large.webp)
Testing of ticket vending machine system in progress at the Putrajaya Sentral MRT Station.
![Testing of ticket vending machine system in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-october-02-large.webp)
Credits: mymrt.com.my.
📅 September 2022
Additional covered walkway completed at the Putrajaya Sentral MRT Station.
![Additional covered walkway completed at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-september-01-large.webp)
Credits: mymrt.com.my.
📅 August 2022
Rectification works for authority inspection readiness at the Putrajaya Sentral MRT Station.
![Rectification works for authority inspection readiness at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-august-01-large.webp)
Installation of Ticket Vending Machine completed at the Putrajaya Sentral MRT Station.
![Installation of Ticket Vending Machine completed at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-august-02-large.webp)
Credits: mymrt.com.my.
📅 June 2022
Aerial view of the Putrajaya Sentral MRT Station showing the authority inspection in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the authority inspection in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-june-01-large.webp)
Yellow tiles works along the benches at the covered walkway in progress at the Putrajaya Sentral MRT Station.
![Yellow tiles works along the benches at the covered walkway in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-june-02-large.webp)
Credits: mymrt.com.my.
📅 May 2022
Aerial view of the Putrajaya Sentral MRT Station showing the external station works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the external station works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-may-01-large.webp)
Testing and commissioning of Automatic Fare Collection gate system in progress at the Putrajaya Sentral MRT Station.
![Testing and commissioning of Automatic Fare Collection gate system in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-may-02-large.webp)
Credits: mymrt.com.my.
📅 April 2022
Installation of Ticket Vending Machine in progress at the Putrajaya Sentral MRT Station.
![Installation of Ticket Vending Machine in progress at the Putrajaya Sentral MRT Station](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-april-01-large.webp)
Credits: mymrt.com.my.
📅 March 2022
Aerial view of the Putrajaya Sentral MRT Station showing the rectification works at viaduct trackside during de-energisation in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the rectification works at viaduct trackside during de-energisation in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-03-mar-01.webp)
Credits: mymrt.com.my.
📅 February 2022
Overview of the Putrajaya Sentral MRT Station and external works completion.
![Overview of the Putrajaya Sentral MRT Station and external works completion.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-02-feb-01.webp)
Testing and commissioning for Automatic Fare Collection gate system in progress at the Putrajaya Sentral MRT Station.
![Testing and commissioning for Automatic Fare Collection gate system in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-02-feb-02.webp)
Credits: mymrt.com.my.
📅 January 2022
BOMBA inspection conducted on 25 January 2022 at the Putrajaya Sentral MRT Station.
![BOMBA inspection conducted on 25 January 2022 at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2022-01-jan-01.webp)
Credits: mymrt.com.my.
📅 December 2021
Aerial view of the Putrajaya Sentral MRT Station showing the defect works and external turfing works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the defect works and external turfing works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-12-dec-01.webp)
Testing for Automatic Fare Collection system in progress at the Putrajaya Sentral MRT Station.
![Testing for Automatic Fare Collection system in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-12-dec-02.webp)
Credits: mymrt.com.my.
📅 November 2021
Aerial view of the Putrajaya Sentral MRT Station showing the additional works such as roof canopy, louvres and metal deck at station entrance in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the additional works such as roof canopy, louvres and metal deck at station entrance in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-11-nov-01.webp)
Turfing works in progress for external works at the Putrajaya Sentral MRT Station.
![Turfing works in progress for external works at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-11-nov-02.webp)
Credits: mymrt.com.my.
📅 October 2021
Aerial view of the Putrajaya Sentral MRT Station showing the temporary Bomba access ready and waiting for Bomba inspection.
![Aerial view of the Putrajaya Sentral MRT Station showing the temporary Bomba access ready and waiting for Bomba inspection.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-10-oct-01.webp)
Customer service officer room completed and waiting for the equipment and furniture to complete at the Putrajaya Sentral MRT Station.
![Customer service officer room completed and waiting for the equipment and furniture to complete at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-10-oct-02.webp)
Credits: mymrt.com.my.
📅 September 2021
Aerial view of the Putrajaya Sentral MRT Station showing the aluminium capping panel works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the aluminium capping panel works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-09-sep-01.webp)
Strip ceiling works in progress at the Putrajaya Sentral MRT Station.
![Strip ceiling works in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-09-sep-02.webp)
Credits: mymrt.com.my.
📅 August 2021
Ceiling works in progress at the Putrajaya Sentral MRT Station.
![Ceiling works in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-08-aug-01.webp)
Credits: mymrt.com.my.
📅 July 2021
Aerial view of the Putrajaya Sentral MRT Station showing the covered walkway works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the covered walkway works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-07-jul-01.webp)
Screeding works in progress at Putrajaya Sentral MRT Station ground level.
![Screeding works in progress at Putrajaya Sentral MRT Station ground level.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-07-jul-02.webp)
Credits: mymrt.com.my.
📅 May 2021
Aerial view of the Putrajaya Sentral MRT Station showing the aluminium composite panel roof installation works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the aluminium composite panel roof installation works in progress](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-05-may-01.webp)
View of the completed Putrajaya Sentral MRT Station lift mural paint.
![View of the completed Putrajaya Sentral MRT Station lift mural paint.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-05-may-02.webp)
Credits: mymrt.com.my.
📅 March 2021
Aerial view of the Putrajaya Sentral MRT Station showing the roof aluminium composite panel installation works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the roof aluminium composite panel installation works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-03-mar-01.webp)
Installation of entrance façade in progress at the Putrajaya Sentral MRT Station.
![Installation of entrance façade in progress at the Putrajaya Sentral MRT Station](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-03-mar-02.webp)
Credits: mymrt.com.my.
📅 February 2021
Aerial view of the Putrajaya Sentral MRT Station showing the tiling and painting works in progress
![Aerial view of the Putrajaya Sentral MRT Station showing the tiling and painting works in progress](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-02-feb-01.webp)
Installation of entrance façade in progress at the Putrajaya Sentral MRT Station.
![Installation of entrance façade in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-02-feb-02.webp)
Credits: mymrt.com.my.
📅 January 2021
Aerial view of the Putrajaya Sentral MRT Station showing the installation of roof aluminium composite panel and entrance façade works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing the installation of roof aluminium composite panel and entrance façade works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-01-jan-01.webp)
Installation of entrance façade in progress at the Putrajaya Sentral MRT Station.
![Installation of entrance façade in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2021-01-jan-02.webp)
Credits: mymrt.com.my.
📅 December 2020
Aerial view of the Putrajaya Sentral MRT Station showing the façade at main station, mural painting works and tiling works at platform and concourse levels in progress
![Aerial view of the Putrajaya Sentral MRT Station showing the façade at main station, mural painting works and tiling works at platform and concourse levels in progress](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-12-dec-01.webp)
Credits: mymrt.com.my.
📅 November 2020
Aerial view of the Putrajaya Sentral MRT Station showing the entrance roofing works completed.
![Aerial view of the Putrajaya Sentral MRT Station showing the entrance roofing works completed.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-11-nov-01.webp)
Aerial view of the Putrajaya Sentral MRT Station showing the scissor crossing northward.
![Aerial view of the Putrajaya Sentral MRT Station showing the scissor crossing northward.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-11-nov-02.webp)
Gable and façade works in progress at the Putrajaya Sentral MRT Station.
![Gable and façade works in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-11-nov-03.webp)
Half round drain drainage works in progress at the Putrajaya Sentral MRT Station.
![Half round drain drainage works in progress at the Putrajaya Sentral MRT Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-11-nov-04.webp)
Credits: mymrt.com.my.
📅 October 2020
View inside the Putrajaya Sentral MRT Station showing floor screeding for tiling works at the station entrance.
Credits: mymrt.com.my.
📅 September 2020
Arial view of the Putrajaya Sentral MRT station showing ongoing work.
![Arial view of the Putrajaya Sentral MRT station showing ongoing work.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-09-sep-01.webp)
Overall view of Putrajaya Sentral MRT Station entrance steel structure works in progress.
![Overall view of Putrajaya Sentral MRT Station entrance steel structure works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-09-sep-02.webp)
Credits: mymrt.com.my.
📅 July 2020
Aerial view of the roof covering at the station box and reinforced concrete works at entrance in progress at the Putrajaya Sentral MRT Station site.
![Aerial view of the roof covering at the station box and reinforced concrete works at entrance in progress at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-07-jul-01.webp)
Entrance concourse slab and lift core wall in progress at the Putrajaya Sentral MRT Station site.
![Entrance concourse slab and lift core wall in progress at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-07-jul-02.webp)
Credits: mymrt.com.my.
📅 March 2020
Aerial view of the Putrajaya Sentral MRT Station site showing the ongoing installation of roof steel truss.
![Aerial view of the Putrajaya Sentral MRT Station site showing the ongoing installation of roof steel truss.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-03-mar-01.webp)
View of the ongoing roof steel truss installation at the Putrajaya Sentral MRT Station site.
![View of the ongoing roof steel truss installation at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-03-mar-02.webp)
Credits: mymrt.com.my.
📅 February 2020
Ground view of the Putrajaya Sentral MRT Station site showing the installation of roof truss in progress.
![Ground view of the Putrajaya Sentral MRT Station site showing the installation of roof truss in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-02-feb-01.webp)
Credits: mymrt.com.my.
📅 January 2020
Aerial view of the Putrajaya Sentral MRT Station site showing the steel structure erection in progress.
![Aerial view of the Putrajaya Sentral MRT Station site showing the steel structure erection in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2020-01-jan-01.webp)
Credits: mymrt.com.my.
📅 December 2019
View of the construction of façade in progress at the Putrajaya Sentral MRT Station site.
![View of the construction of façade in progress at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-12-dec-01.webp)
Credits: mymrt.com.my.
📅 November 2019
Aerial view of the Putrajaya Sentral MRT Station platform works in progress.
![Aerial view of the Putrajaya Sentral MRT Station platform works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-11-nov-01.webp)
Credits: mymrt.com.my.
📅 October 2019
View of the Putrajaya Sentral MRT Station showing the external plastering and staircase in progress.
![View of the Putrajaya Sentral MRT Station showing the external plastering and staircase in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-10-oct-01.webp)
Credits: mymrt.com.my.
📅 September 2019
Aerial view of the Putrajaya Sentral MRT Station showing station platform works in progress.
![Aerial view of the Putrajaya Sentral MRT Station showing station platform works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-09-sep-01.webp)
Credits: mymrt.com.my.
📅 August 2019
View of the Putrajaya Sentral MRT Station showing the completed concourse and intermediate level while platform for post tensioning beam and block works in progress.
![View of the Putrajaya Sentral MRT Station showing the completed concourse and intermediate level while platform for post tensioning beam and block works in progress.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-08-aug-01.webp)
Credits: mymrt.com.my.
📅 July 2019
Station box segmental box girder launching completed at the Putrajaya Sentral MRT Station site.
![Station box segmental box girder launching completed at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-07-jul-01.webp)
View of the Putrajaya Sentral MRT Station site showing the ongoing construction works for station platform slab.
![View of the Putrajaya Sentral MRT Station site showing the ongoing construction works for station platform slab.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-07-jul-02.webp)
Credits: mymrt.com.my.
📅 June 2019
Aerial view of the ongoing intermediate level slab construction works at the alignment near Putrajaya Sentral MRT Station site.
![Aerial view of the ongoing intermediate level slab construction works at the alignment near Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-06-jun-01.webp)
Segmental box girder erection works in progress at the Putrajaya Sentral MRT Station site.
![Segmental box girder erection works in progress at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-06-jun-02.webp)
Credits: mymrt.com.my.
📅 May 2019
Aerial view of long span at the Putrajaya Sentral MRT Station site.
![Aerial view of long span at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-05-may-02.webp)
Credits: mymrt.com.my.
📅 March 2019
Aerial view of the completed works for launching segmental box girder at the Putrajaya Sentral MRT Station site.
![Aerial view of the completed works for launching segmental box girder at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-03-mar-01.webp)
View of the completed hammerhead at the ERL crossing near the Putrajaya Sentral MRT Station site.
![View of the completed hammerhead at the ERL crossing near the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-03-mar-02.webp)
Credits: mymrt.com.my.
📅 February 2019
Segmental Box Girder launching in progress at the Putrajaya Sentral MRT Station site.
![Segmental Box Girder launching in progress at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-02-feb-01.webp)
Credits: mymrt.com.my.
📅 January 2019
Aerial view of the Putrajaya Sentral MRT Station site.
![Aerial view of the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-01-jan-01.webp)
Segmental box girder launching in progress at the Putrajaya Sentral MRT Station site.
![Segmental box girder launching in progress at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2019-01-jan-02.webp)
Credits: mymrt.com.my.
📅 December 2018
Construction of the station columns at the Putrajaya Sentral MRT Station site.
![Construction of the station columns at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2018-12-dec-01.webp)
Launching of Segmental Box Girder in progress at the Putrajaya Sentral MRT Station site.
![Launching of Segmental Box Girder in progress at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2018-12-dec-02.webp)
Credits: mymrt.com.my.
📅 November 2018
Aerial view of the Putrajaya Sentral MRT Station site.
![Aerial view of the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2018-11-nov-01.webp)
Credits: mymrt.com.my.
📅 September 2018
Aerial view of the completion of launching gantry assembly works at the Putrajaya Sentral MRT Station site.
![Aerial view of the completion of launching gantry assembly works at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2018-09-sep-01.webp)
Credits: mymrt.com.my.
📅 August 2018
Pier head construction at the Putrajaya Sentral MRT Station site.
![Pier head construction at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2018-08-aug-01.webp)
Credits: mymrt.com.my.
📅 June 2018
Completion of pier head at the Putrajaya Sentral MRT Station site.
![Completion of pier head at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2018-06-jun-01.webp)
Credits: mymrt.com.my.
📅 October 2017
Bored piling and pile cap works in progress at the upcoming Putrajaya Sentral Station.
![Bored piling and pile cap works in progress at the upcoming Putrajaya Sentral Station.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2017-10-oct-01.webp)
Credits: mymrt.com.my.
📅 February 2017
Ongoing piling works at the Putrajaya Sentral MRT Station site.
![Ongoing piling works at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2017-02-feb-01.webp)
Ongoing tree relocation and trenching works at the Putrajaya Sentral MRT Station site.
![Ongoing tree relocation and trenching works at the Putrajaya Sentral MRT Station site.](/wp-content/uploads/2021/09/putrajaya-sentral-mrt-station-2017-02-feb-02.webp)
Credits: mymrt.com.my.
📅 January 2017
Ongoing load test at the MRT construction site near the Putrajaya Sentral Station.
![Ongoing load test at the MRT construction site near the Putrajaya Sentral Station.](/wp-content/uploads/2022/05/putrajaya-sentral-mrt-station-2017-01-jan-01.webp)
Credits: mymrt.com.my.
Hawk-eye View
Location of Putrajaya Sentral MRT Station and its surrounding area.